Water in the upper reaches of the Ramu drives the generators of PNG’s largest hydro-electric scheme at Yonki in the Eastern Highlands. Only short distances of the 720-kilometer river are navigable, and the flat and swampy land at the mouth of the river is frequently flooded in the wet season.
